Friday, April 18, 2008

Production schedule (updated 4/22/08)

4-18-08
On Sunday or Monday (depending on the day that the actor is available) I will record the voice of the actor, for the narration. I will not be able to shoot the footage I intended to shoot because I made a mistake in the reservation and rented out a digital camera instead of a dv camera. This, however, doesn't slow down the process very much because I plan on using photos instead of footage for certain shots in the beginning, like when he is comparing the good and bad about the Bronx. Before I obtain the sound however I will have finished the the animations so that I can tell exactly how long I want the sound to be. The actual shooting will be done from Thursday-Monday in that time range. The reason why I give such a general range of time is because the actors will be available at different days and i plan to shot in at least 2 parts or more. One day shoot the scenes with Norman in his room on the computer and the rest of the days shoot the scenes that come in while he is describing them.


4-22-08
I have casted 3 friends to act out the parts of the characters. Damion Blaire, Adriana Warner and myself as Norman, Mike and Chris. me and Damion will be playing mike and Chris and Adriana will be Norman. I have rented a camera for use on Thursday I will shoot as much as I possibly can on that day. Also I have found someone who might just be able to help me out with editing if i can finish the shooting on Thursday, which is something I'm confident I can do so there will be a 90% chance of him being able to help me edit. If all this goes according to plan I can start editing as early as Sunday-Monday and just continue to edit to completion from then on. I know exactly what I want to do in editing so I don't think it will take too long. I think that I can have the movie done with just enough time to be able to make a decent title sequence, without having to worry too much about the movie in terms of completing it.

No comments: